Hadassah Project and HCP-Go – Tal Levanon presents Case Study
This talk is a about: How the HCP reflected the status of the project throughout the project’s life and what can be learned from it?The

This talk is a about: How the HCP reflected the status of the project throughout the project’s life and what can be learned from it?The

Project management case studies – HCP analysis HCP analysis has already been performed on more than 200 projects. Even though the same analysis is performed

One of our very first projects was the Chords Bridge in Jerusalem. I met with Baruch Gover, the project manager, in his room. He looked