One month trial as a gift for download

HCP Go :
Comprehensive analysis of your project schedule
HCP Go –
MS Project plugin for independent schedule analysis
One month trail as a gift for download

200+ projects were analyzed by companies that include...















The HCP Analysis assisted in bringing the project's completion date ahead by three weeks and a with a budget saving of $700,000.

Ariel Meyuhas
MAX Group -
Founder & COO
in His Project
“We used HCP to schedule analysis in building a sterile compound. The analysis revealed significant findings, which we did not know how to identify by any other surgical method. The HCP insights helped us complete the project three weeks ahead of schedule, with savings of $700,000 below the original budget.”

Udi Lehrman
Ben-Gurion University -
VP Design Construction & Maintenance
in a Schedule
Today, at Ben-Gurion University and its’ branches, no planning, construction, renovation or maintenance project, big or small, begins without a schedule. We run every large & complicated schedule through the HCP application and receive within moments an analysis, which shows us the possible malfunctions and our probability of meeting budget & scope. In the past, the HCP application has revealed failures likely to occur during the project and gave us an opportunity to correct them before becoming a stumbling block. This helped resolve conflicts, which arose in the face of unrealistic timetables which were diverted in favor of one side. Eventually, the crisis was resolved peacefully, even before the project began.

Uzi Buchbinder
CPM Construction Management Ltd. -
Senior PM
in Contractor's Schedule
Monitoring over the contractor’s schedule is carried out on the engineering and technical level in terms of the correctness of the activities, the continuity and the resources included therein. The HCP analysis enables to accurately understand the project’s schedule structure, detects faults that can’t be found in manual labor and helps orient oneself within a schedule which includes hundreds or thousands of activities. Without a doubt, the HCP analysis is a convenient and fast way to get a reliable schedule to a very high standard which meets the goals of the project.”
Three-step schedule analysis:
1.
analyze
Analyze your project schedule by yourself, and receive a detailed report in seconds
2.
improve
Improve your schedule with the HCP analysis findings
3.
Manage
Manage your project with insights and tools
you don't have today
Additional information about the HCP method
Project network mathematical paths analysis
The HCP report - What does it include and how is it used?
The report includes an executive summary, schedule integrity analysis, HCP critical path analysis and examples of critical path analysis
How to use HCP in my project?
Run the HCP-Go on your schedules file!