Installing the HCP-Go
For installation instructions, follow these steps:
- Click here to download the HCP-Go plugin – fill in the details and download the installation file.
- Extract the ZIP file
- Close MSProject and run HCPGo.exe
- Open the desired file in MSProject
- Under ‘Tasks’, click ‘Go’ Run Analysis. The HCP app will then open in your browser.
